Sign In | Join Free | My himfr.com
Home > Conveyor Belt Vulcanizer >

Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate

Jiangyin Tongxin Vulcanizing Machine Manufacturing Co., Ltd.
Contact Now
    Buy cheap Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate from wholesalers
     
    Buy cheap Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate from wholesalers
    • Buy cheap Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate from wholesalers

    Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate

    Ask Lasest Price
    Brand Name : Tongxin
    Certification : IS0
    Price : Negotiable
    Delivery Time : 15-30days
    Payment Terms : T/T,L/C,Western Union,Paypal and MoneyGram
    • Product Details
    • Company Profile

    Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate

    High quality selling conveyor joint vulcanizing machine

    The cooling system of mining TX series produced by our company adopts German technology-efficient water cooling plate products. The cooling time of the equipment after completion of vulcanization can be completed within 15-20 minutes. The cooling efficiency is improved by at least 6-10 times. Both ordinary and explosion-proof vulcanization joint machines can be equipped with a rapid cooling system. The high-efficiency water cooling plate of the vulcanizing machine is exquisitely made of high-quality aluminum alloy and copper materials.

    ADVANTAGES:
    HEATING PLATEN

    Custom extruded plank, silicone heating elements (up to 180°C/356°F), and durable composite insulating packaging are used to construct a flexible platen that contours to belt irregularities.
    It takes 15~25mins rise up to vulcanizing temperature (about 145°C).
    PRESSURE SYSTEM
    Signature ANTAI “Pressure Bag” uniform pressure system is lighter up to 4 times than the outdated pressure bag.
    The pressure bag can reach full expansion in one time and ensure the uniform pressure up to 3.0MPa.
    PRESSURE PUMP
    Automatic mute pressure pump own the features as smaller size, lighter weight and high impact-resistance. Compared with the manual pump, the operating pressure can be 23kg/cm2 (2.3MPa).

    COOLING SYSTEM (Option Available)
    Custom “Extruded Plank” cooling system within platens is made by several cuprum pipelines, it only takes about 20mins to drop the temperature down to 60°C.

    AUTOMATIC CONTROL BOX
    With automatic temperature control, security alarm and automatically switch off the power. The control box can monitor the temperature of 3-5 different points on each heating platen at the same time to ensure the result of splicing.

    1 Overview

    vulcanizing machine is equipped with a water-cooling circulation device. The heating plate has a fast cooling speed and can be disassembled in 5-10 minutes. Especially in hot weather, high temperature environment and tight construction period, using this water-cooled vulcanizing machine can improve work efficiency and shorten construction period.

    vulcanization mechanism is light and lightweight, and can be moved by hand. Consider the convenience of power and water before installation. Use a special water pipe to connect the tap water source to the cooling water pipe of the upper and lower heating plates of the vulcanizing machine, but do not put water for the time being. At this time, start the constant temperature to the end of the vulcanization constant temperature time. At this time, turn on the tap water and pass water to the hot plate. When the temperature drops to the process specified value At this time, the equipment can be drained and the vulcanization operation can be completed.

    2. Technical parameters:

    (1) curing pressure: 1 ~ 1.8 Mpa;

    (2) curing temperature: 145 ° C;
    (3) Surface temperature difference of vulcanized sheet: ± 5 ℃;
    (4) Heating time (normal temperature to 145 ° C): not more than 30 mins;
    (5) Power supply voltage: 380V 660V 50 / 60HZ 3PHASES;
    (6) Temperature adjustment range: 0 ~ 200 ℃;
    (7) Timing adjustment range: 0 ~ 99 mins;
    (8) The gap of the upper and lower heating plates after pressing 0.8Mpa is not more than 0.4mm.

    Project/Data/Model

    Adhesive tape

    width
    (mm)

    specification

    Heating plate size

    Length × width
    (mm)

    Total power
    (kw)
    Heavy weight
    (kg)

    Dimensions

    Length × width × height
    (mm)

    total weight
    (kg)
    Configuring device
    Manual pumpElectric control box

    TXCK-650

    DJSL/DGLJL-650

    650650×830830×8209.8561320×830×58539811
    650×10001000×82011.8661320×1000×58546011

    TXCK-800

    DJSL/DGLJL-800

    800800×830830×99511.89701450×830×58548511
    800×10001000×99514.4791450×1000×58555011

    TXCK-1000

    DJSL/DGLJL-1000

    10001000×830830×122814.7821700×830×58555611
    1000×10001000×122817.8951700×1000×58559611

    TXCK-1200

    DJSL/DGLJL-1200

    12001200×830830×143117.2961950×830×75078411
    1200×10001000×143120.71131950×1000×75090011

    TXCK-1400

    DJSL/DGLJL-1400

    14001400×830830×165319.81072150×830×90085711
    1400×10001000×165323.91322150×1000×900108011

    TXCK-1600

    DJSL/DGLJL-1600

    16001600×830830×186722.31202380×830×900110211
    1600×10001000×1867271462380×1000×900140011

    TXCK-1800

    DJSL/DGLJL-1800

    18001800×830830×207924.91372620×830×900124711
    1800×10001000×207930..1642620×1000×900150011

    TXCK-2000

    DJSL/DGLJL-2000

    20002000×830830×230327.61542830×830×900138511
    2000×10001000×230333.21822830×1000×900175011

    TXCK-2200

    DJSL/DGLJL-2200

    22002200×830830×247829.71652997×830×900144611
    2200×10001000×247835.81982997×1000×900180011

    Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate

    1.Frame

    2.clamping mechanism

    3.horn

    4.screw

    5 .nut

    6. Washer

    7. High pressure hose

    8 .Pressure test pump

    9 .heat shield

    10.upper heating plate

    11.Secondary cable

    12.Electric control box

    13.Primary cable

    14.lower heating plate

    15.Water pressure plate


    1. Before the installation of the combing machine, the main parts (such as electric healing plates, pressure devices, racks, etc.) are evenly separated and separated, and the vulcanizer is temporarily transported to the site for temporary installation.

    2. each separate separation of the parts, is also a frequent moving parts. Generolly, the heaviest parts can be handled by two people, so it is convenient to install and disassemble.

    3. Before installation, find a more spacious place on the installation of the tape conveyor. In this place, not only the indefinite operating area and space, but also the placement of the tape and the power wiring are convenient.

    4.Before installation, on the belt conveyor installation line, disassemble the upper rollers and set up a working platform in the form shown in Figure 2. If it is glued in the field, use a canvas to build a temporary rainproof shed around the work platform

    5.Install the tools of the vulcanizing machine, the tools for processing the tape joints, the power supply wires, etc., and confirm that the glued village materials (such as cover rubber, core glue and glue) are within the validity period, the manufacturer and the production date.


    Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate

    6. Installation of the vulcanizer is carried out as follows:

    (1) Place the single lower machine in the form shown in Figure 3;

    (2) As shown in Figure 4, first place the pressure device (water pressure plate) on the placed lower frame machine; then place the lower electric plate on it. After the three are aligned, the lower electric heating plate is covered with plastic film (or talcum powder); Note: When multiple vulcanizers work in parallel, a thin metal plate with a 0.2x50x seam length is placed at the joint of the lower electric plate.

    (3) Place the tape joints that have been processed and processed well and filled with the rubber material on the lower hot plate; after finding the center line, fix the tape on both sides with the clamp plate and the clamping mechanism. Its form is shown in Figure 5;

    (4) on the tape joint. Place the plastic film (or talcum powder) in the position corresponding to the lower hot plate, and then place the electric heating plate and the heat insulation board on it in order. Its form is shown in Figure 6.

    Note: When multiple vulcanizers work in parallel, a thin metal plate with a 0.2x50x seam length is placed at the joint of the lower electric plate

    Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate

    (5) Place the upper frame on the heat insulation board as shown in Figure 7, and align and align with the lower frame.

    (6) According to Figure 8, install the pre-tightening bolts, washers and nuts in the elongated holes at the upper and lower frames, and tighten the nuts with a wrench. At this point, the main part of the vulcanizer is installed.

    (7) According to Fig. 9, the quick joint of the pressure pump system is connected with the water inlet hole of the pressure device, and the primary power supply wire is correspondingly inserted into the socket of the electric heating control box, and one end of the secondary wire is inserted in the electric heating control box. On the socket, the other end is inserted on the hot plate; the corresponding one of the thermal resistance (or thermocouple) wire is inserted into the socket of the electric heating control box, and the other end is inserted into the temperature measuring hole of the electric heating plate. At this time, the vulcanization mounting is completed, and the timing operation of pressurization and heating is prepared.

    Maintenance and maintenance

    1. Before use. check the insulation resistance of the hot plate. If it is too low, it should be energized and dried until the insulation value reaches 50MΩ or less.

    2. in the use of moving in the process should be handled with care. civilized operation;

    3.If you work in the field, you should have reliable rain and water proof means to avoid being affected by rain and moisture.

    4.When the use of its length is completed. it should be placed in the warehouse where the air circulation, relative humidity is not more than 85%. and is not affected by rain. The sleeper is raised below, and it is strictly prohibited to be placed on the ground


    Quality Compact Structure Conveyor Belt Vulcanizer Small Footprint Easy To Operate for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Jiangyin Tongxin Vulcanizing Machine Manufacturing Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)